Delivery of crushing and screening contract of 1.7 million tonnes of road building materials to main roads specification or a Great Northern Highway overpass, encompassing the supply of a range of equipment
Rehabilitation Transportation Carting rocks for the rehabilitation of the mine site.
Our Transport team was engaged to transporting base course laterite product from a quarry pit to a designated area.
Consolidated Transport Services completed a significant road project in a bustling metropolitan area involving the transportation of waste ballast to a new project site.
Our company provided a comprehensive range of transportation and equipment rental services to our esteemed clientele. This included eight double road trains, wheel loaders, rollers, skid steers, and water carts, all of which were designed to cater to the diverse requirements of our clients.
Our highly skilled and experienced team provided top-notch labor solutions for a variety of mine-related projects, including industrial cleaning, hose crews, and tight-access cleanup during shutdowns.
Consolidated Transport has been carting lithium from Greenbsuhes mine to Bunbury Port.
Specialised bulk transport supporting the build of Onslow’s autonomous truck haul road by carting material from quarry pits to construction site.
Consolidated delivered 45,000T of ballast from a quarry to a major Perth road extension project.
For this project we explored how to ensure Consolidated Group is working towards a greener future by developing a decarbonisation plan for 2023 - 2030.
For this project we transported ballast for a major project in Perth. We then screened it for repurposing using our screening unit and then transported it back to the project. This project ran for two months and we screened over 10,000T of ballast.
Pilbara Heavy Haulage Oversize Moves for various clients in the Pilbara region.
Bulk cartage of waste sand from dredging sand (103500m) from Point Peron to Miller Road land fill facility to be utilised as capping. To transport the bulk material our team loaded 10 trucks on a constant rotation to the land fill facility and return. We had to engage local road users to set transport route and work around peak periods and school zones.
Construct various limestone track for the DFS in conjunction with city of Rockingham Successfully transport 9500 tonnes of limestone from Miller Road quarry to the job site. Given the tight access we had to use semi tippers and 6 wheelers to ferry down the access point. Traffic management and stockpile locations were implemented in each area.
Kwinana KWTE. Construct a basin, piling pads and detailed earth works for installation of earthing cables and concrete blinding. Creating 4 piling pads on the inner side of the basin for piling works to be conducted. Remove, transport and dispose of 12,000m3 of waste material.
Metro Net Yanchep / Thornlie Cockburn link. Supply of water carts, 6x4 end tippers, articulated haul trucks, semi tippers/side tippers, graders, rollers, skid steers, excavators and wheel loaders as required with both wet and dry hire options. Currently we are supplying both Thornlie Cockburn Link and Yanchep Rail Extension with ongoing monthly service.